Đăng ký và nhận 50K | bắn cá jili jilihow

Product

Solar Water Heater Gold 58 – 180

Solar Water Heater Gold 58 – 180

Giá sản phẩm : 7640000

With high heat absorption and long-term insulation mechanism, large-capacity container is the difference of Thai Duong Nang, helping users save time and costs for direct use of hot water in cooking in their daily activities.



Please contact us for advice:
Son Ha International Corporation
Lot CN1, Tu Liem Industrial Zone, Minh Khai, Bac Tu Liem Dist, Hanoi, Vietnam.
Hotline: 1900 636 092

   

NO.                   
Content Preparation (Tools) Explanation
 Step 1 Introduction to the product: Outstanding features, advantages, use, benefits to users   Beyond the limits of the equipment needed in the households, TDN is a unique creation with a new perspective in the strategic development of new products of Son Ha.
Proud to be the solar water heater supplier in VN first, SH creates TDN with outstanding features such as Power Saving / Environmentally Friendly / Safe for use.
 Step 2 Installation conditions:
Location, flat surface
  The base must be placed on a flat surface without lifting jack. The base plate should be fixed firmly to the exposed flat surface. Depending on the installation location, placing TDN toward south or south west angling 10 degrees is the most effective. Distance from the water tank to TDN must ensure enough pressure to supply the natural water for TDN. In case it is too low or too high, it is necessary to use pressure tank (BNP).
Note: when installing, it is necessary to avoid the location with possible danger such as power wires, tree, or near the wall…
Step 3 Photos of accompanying tools and installation tools   Prepare enough spare parts, tools for installation in the most convenient place such as wrench, screwdrivers connect screws tightly with the stand bars, Electronic pliers, speculum pliers, water pliers, and welder.
Step 4 Photos of BBO containers, vacuum tubes, TDN spare part box   To complete the installation of TDN water heater should have adequate boxes which contain Insulation bottle, vacuum tubes and spare parts.
Customers can refer to solar water heater installation guide included in the insulation tank.
 Step 5 Insert a vertical bar with the bottle holder  
 
 
M6 wrench, screwdrivers 4 edges
Insert a vertical bar with the bottle holder.
Use a wrench and screwdrivers to tighten bolts.
 Step 6 Insert the cross bar Insert the cross bar. Use a wrench and screwdrivers to tighten bolts.
 Step 7 Insert the horizontal bar Insert the horizontal bar on the right. Use a wrench and screwdrivers to tighten bolts.
 Step 8 Install the opposite site the same Insert the horizontal bar on the left. Use a wrench and screwdrivers to tighten bolts.
 Step 9 Fit the rear brace Fit the rear brace. Use a wrench and screwdrivers to tighten bolts.
 Step 10 Insert two rear cross bars Insert two cross bars toward the south. Use a wrench and screwdrivers to tighten bolts.
 Step 11 Install tube holder Install tube holder. Use a wrench and screwdrivers to tighten bolts.
Step 12 Install 2 braces for tube holder
(2 small bars)
  Install 2 braces for tube holder. Use a wrench and screwdrivers to tighten bolts.
After completing the installation of the base of Thai Duong Nang water heater, you remember to use screwdrivers and wrench to tighten all bolts before mounting the other parts.

 Step 13 Install the insulation bottle: quickly put the screw to the stand-by hole of the tube holder, balance the BBO before screwing Wrench M8, screwdrivers 4 edges Install the insulation bottle: quickly put the screw to the stand-by hole of the tube holder,
Then install two tubes of two heads of the installation bottle, balance the tube with the insulation bottle, then tighten 4 screws in the insulation bottle.
Step 14 Close the lid (under BBO)   Close the lid under BBO. Use the plier to keep the power-support plug, then rotate in clockwise and push up (in order not to tilt the washer)
 Step 15 Install vacuum tube: Insert gasket into the tube, connect tube holder with the tube rack, Insert two tubes in 2 sides first Lubricating solution Install vacuum tube. First we lubricate the hole. Then insert the gasket into the tube. Note: Insert two tubes in 2 sides first. Align the permanent insulation bottle. Then complete installation of tube.
 Step 16 Insert the dual thread: Wrap the adhesive tape in the reverse direction of the thread, put it straight to the core. Adhesive tape, speculum pliers, water pliers Insert the dual thread: Wrap the adhesive tape in the reverse direction of the thread, put it straight to the core. Then insert the elbow into the insulation bottle. Finally, do the thermal welding.
 Step 17 Install the discharge valve: Wrap the adhesive tape in the reverse direction of the thread, weld the heat pipe with the elbow and socket. Ventilation tube is 10cm higher than the water supply tank. Adhesive tape, elbow, socket, heat pipe, heat welding machine, pipe-cutting scissors, speculum pliers, water pliers Install the discharge valve: Wrap the adhesive tape in the reverse direction of the thread, weld the heat pipe with the elbow and socket. Ventilation tube is 10-20cm higher than the water supply tank.
 Step 18 Drill a hole on the floor: Position, drill a hold, put the wall plug, screw Drill, wall plug & screws, wrench Drill a hole on the floor: Position, drill a hold, put the wall plug, screw
Step 19 Complete installation    
 Step 20 Necessary notes: the common mistakes and how to install correctly. Warranty terms, solution for no-sunshine weather, how to choose a good products for some users.   The best time to steam water is 6-7am in order to avoid energy absorbed into the vacuum pipe, breaking the pipe.
When installing, it is necessary to install one input valve and one output valve in order to facilitate repair and warranty.

RELATED PRODUCTS